KELKEN
Construction Systems

550 Hartle Street, Suite C
Sayreville, NJ 08872

Phone: 732-416-6730
Fax: 732-416-6733

Products: www.KELKEN.com

 

 

 


youtube2 Visit Our Video Channel
 
 

 

New Featured & Job Video

Sound Wall Construction
Hauppauge, New York 

Story Link

CrackBond Epoxy
Concrete Repair Kit

 

  • T-Port Resin Injection System
  • Virtually Eliminates Under Filling
  • New crack kit for complete repair projects

 

crack injection kit

 

 

 

Miracle Bond 1350

Multi-Purpose Repair Epox
 

Miracle Bond 1350 is a two-component, high strength, high modulus, moisture insensitive, non-sag, ceramic blend epoxy system. It’s ideal for use as a bonding agent for almost any material, including metal, concrete, brick, wood, stone, block and other substrates.
Multi-Purpose Repair Epoxy

 

ULTRABOND

Epoxy Anchoring Adhesive
 

Ultrabond 1 Epoxy Anchoring Gel is a two component (1:1 ratio), 100% solids, high modulus, structural epoxy gel. It is a solvent free, no odor, high strength, moisture insensitive, non-sag epoxy system.
Kelken ATC Ultrabond

 

 On The Job With KELKEN  Spring 2013

Middlesex County NJ Utility Authority's Sayreville Waste Water Treatment Plant.  This job is the retrofit of the rail system that guides a traveling bridge across the waste water holding tank.  Quad Construction of Philadelphia is the installer / contractor for Gantrex Canada the manufacture of the rails and the flying bridge.

423131 423132 423133

Watch our short (3 minute) job highlight video below for the product and installation details on this anchoring project.  Keligrout Polyester Resin was used to secure the threaded stainless steel anchors into the concrete.
 
The existing rails and attachments were completely rusted out due to the highly corrosive conditions at the sediment tanks.  Additionally the original hardware was only galvanized steel and the replacement hardware is all ASTM 316 stainless steel.
 
All the existing hardware and rails were removed from the top of the concrete tank walls, the old anchors were core drilled out of the concrete and the holes were cleaned out with compressed air.  New stainless anchors installed with Keligrout from quart cans.  After 24 hour cure the rail attach plates were bolted down and the rails were attached.
 

KELKEN ON THE JOB NEWSLETTER

Information on KELKEN and ATC products featured in real job site applications.  Sign up for an email reminder that goes out quarterly or when we have a featured job, new video or product installation to share.  Sign Up Link